Featured Post

Import-Export

The first task in our business was establishing contacts.  Because we had business associates throughout America and Africa, this was relatively easy.  In addition, all our investors were bringing to the company many years of experience and through that, had already established many contacts.  We...

Read More

Label Printing And Tailored

With the PrintoLUX Configurator quickly to the needs-based printing system In the field of industrial marking technology more and more people move to their labeling needs through an in-house production itself. Since it is possible due to modern, simple manufacturing process in this area easily to give...

Read More

LOTO Procedure

Posted by Geneva | Posted in News | Posted on 17-08-2021

Tags: ,

0

In international practice, blockers and a package of measures to prevent injury accidents, and technological system called LOTO. To read more click here: Best Buy. LOTO system includes a set of model rules and principles of working in hazardous areas of production, different types of blockers and special accessories. The implementation of the procedure to block consists of several stages, which allow you to completely avoid the risks of injury to personnel. First step is to write a program that defines and establishes the procedure for disconnecting and isolating equipment. To know more about this subject visit Glenn Dubin, New York City. The second phase of training in the principles of information and process control for the staff engaged to perform work. The third stage – the choice the appropriate type of locking devices and accessories. In our case, the safe option of the work as follows. Responsible for the execution of works, must clearly represent all possible hazards for all phases of work and be able to control them.

The operator is a step by step to the stages of the work order and install / uninstall blockers. Next, you need to gather all professionals operating equipment and professional service. Trace, that they would share their knowledge about the peculiarities of maintenance and repair. To inform and agree with the procedure and stages of work, blocked sites, select the type of blocker. In our case, for security purposes should be de-energized and locked the central control panel, switches, equipment, valves, piping and valves which generated by supply pressure in the pipeline. The essence of the procedure of blocking can be formulated as follows.

The Fact

Posted by Geneva | Posted in News | Posted on 19-10-2016

Tags: ,

0

Where and how to install safety devices such as RCDs RCDs are installed in the wiring closet apartment (you can use already Cabinets are available). There are several installation options: One of the RCD on all home (must be a leakage current of 30 mA). The advantages of this solution include low cost devices, as well as the fact that the RCD will not take up much space. K disadvantages of this device is that it is difficult to determine which of the existing lines, there was a leak, as well as the fact that when the device is triggered the whole apartment is without light. One RCD (30 mA at rosette line) + RCD (10 mA) per line (for example, the line feeding the washing machine, jacuzzi and a "warm" floors).

Compared to the previous, it is more modern and convenient option, since if there any problems with electrical wiring or appliances will be switched off only the appropriate line and not the whole apartment. The disadvantages of this system – higher costs and the need to have much more free space. More than one RCD, as a rule, be established only in the individual distribution inside flap, specially designed for this purpose. In a conventional plate on the landing for this is usually not enough space. At use this option, next to a circuit breaker that protects the entire home, installed the RCD. In this case it is better to use not common, and the so-called selective RCD trip time which is 0.3-0.5 sec. A longer response time would allow to react to the evolving leak and shut down the first line of devices that protect individual electrical lines or at home (apartment).

Only if they do not will work, it will disable the entire scheme of power supply as a whole. Basic mistakes when installing RCD most common error when installing the RCD is connected to the RCD load in the circuit where there is a connection of zero main conductor with exposed conductive parts of electrical systems or connection to the protective earth conductor. Also, the following error: The connection to the load neutral conductor to the RCD, the connection of loads to neutral conductor of another RCD, the jumper between the neutral conductor of various RCD. Calculation, installation and commissioning with RCD circuit wiring should be dealt with only by qualified professionals. Just in case you get a guarantee that the protection work on time. When installation is impractical RCD RCD impractical to establish if there is an old worn-out wiring in the premises, as in this If the property RCD to detect current leakage may cause some problems. For example, if the old wiring device may work Electrical safety in unpredictable ways. Therefore, in this case it is recommended installation in locations with high-risk outlets with built-in RCD. MPS Electrical